Page 1 of 5

4jg2 engine rebuild

Posted: Sun Dec 26, 2010 7:10 pm
by scruff123
Hi all
just making a thread to post pics etc of doing my rebuild if anyone is interested.

no rings were broken every thing just worn out from 200k of bad oil changes before i owned it

so far i have engine out and all stripped down, hardest part was getting the liners out! ended up riggin up a sort of press with a old stand siting in the shed. just getting prices etc so hopefully have all parts end of january.

enjoy

ready to come out:
PC113004.JPG
PC113011.JPG
PC082998.JPG
PC083002.JPG
PC083003.JPG

got the block all stripped down ready to take the liners out, then pressed them out with a manual hydralic ram
PC243014.JPG

ground up a old flange to fit in and push the liners, worked well untill the last liner, so had to make another one out of 12mm x 40 flat bar, worked a treat
PC243019.JPG

Re: 4jg2 engine rebuild

Posted: Sun Dec 26, 2010 7:16 pm
by scruff123
PC243020.JPG
PC243025.JPG
PC243018.JPG

oops. haha
PC243022.JPG
PC243023.JPG

the liners
PC243015.JPG
PC243016.JPG

liner removed
PC243017.JPG

Re: 4jg2 engine rebuild

Posted: Mon Dec 27, 2010 4:06 am
by scruff123
hey guys just sorting out what parts i need and was wondering do i need to get new head bolts? cheers

Re: 4jg2 engine rebuild

Posted: Mon Dec 27, 2010 5:36 am
by pig75
I used the old bolts on my 2.8. As long as there not pitted they should be fine

Re: 4jg2 engine rebuild

Posted: Mon Dec 27, 2010 5:52 am
by scruff123
pig75 wrote:I used the old bolts on my 2.8. As long as there not pitted they should be fine

ok cheers, yea they look still like new

Re: 4jg2 engine rebuild

Posted: Tue Dec 28, 2010 1:30 am
by scruff123
well i was cleaning up the block and fount this! in the cylinder wall not the liner it has coroded through were the coolant runs through one other cylinder has a pinhole.
PC273026.JPG
PC273029.JPG
any sugestions on what i could do?? or will the liner seal it again? never had water in the oil before and never used any water so it wasnt leaking previosly with the old liner in

Re: 4jg2 engine rebuild

Posted: Thu Jan 06, 2011 2:17 am
by geeves
Engine reconditioner should be able to weld that up good as new and check the other bores but it could cost as much as another engine. I wouldnt take the chance of it not leaking.

Re: 4jg2 engine rebuild

Posted: Thu Jan 06, 2011 9:55 am
by Demonic
scruff123 wrote:pig75 wrote:I used the old bolts on my 2.8. As long as there not pitted they should be fine

ok cheers, yea they look still like new


DO NOT, DO NOT USE OLD BOLTS!, for the last month (or 3) my truck has been in getting some major work done. we reused the old bolts and had 2 snap puting the head on, and this was b4 we had reached full correct torque. Although it says you can reuse them they do stretch.

If you unsure of the engine before you owned it i suggest new. Headmaster in wellie can do a full set for about $150.

Re: 4jg2 engine rebuild

Posted: Thu Jan 06, 2011 2:42 pm
by scruff123
Demonic wrote:scruff123 wrote:pig75 wrote:I used the old bolts on my 2.8. As long as there not pitted they should be fine

ok cheers, yea they look still like new


DO NOT, DO NOT USE OLD BOLTS!, for the last month (or 3) my truck has been in getting some major work done. we reused the old bolts and had 2 snap puting the head on, and this was b4 we had reached full correct torque. Although it says you can reuse them they do stretch.

If you unsure of the engine before you owned it i suggest new. Headmaster in wellie can do a full set for about $150.

cheers mate ill get new ones. good to be on the safe side

Re: 4jg2 engine rebuild

Posted: Mon Jan 31, 2011 2:13 am
by scruff123
scruff123 wrote:well i was cleaning up the block and fount this! in the cylinder wall not the liner it has coroded through were the coolant runs through one other cylinder has a pinhole.
PC273026.JPG
PC273029.JPG
any sugestions on what i could do?? or will the liner seal it again? never had water in the oil before and never used any water so it wasnt leaking previosly with the old liner in



went and picked up my parts from isuzu parts specialists in auckland on saturday and had a good chat to the reconditioner, also found out when looking at the new liners that my old ones were cast iron so it has had a rebuild at some stage, that is why they were so hard to get out and also the reason for the hole in the coolant passage between bores, he said that with a little bit of corrosion and having to bore it out slightly to fit the cast liners results in very thin wall or a hole but because the cast liners are thicker and a press fit i dont need to worry. i am getting them to install the liners and machine the tops, hone them and remove/fit new camshaft bearings for $600, other parts i got were pistons, rings, all bearings, camshaft, gasket set, headbolt kit, engine mounts, cambelt, starter motor and full hose kit all for $1600, so that including machining and istallation of liners $2200 i thought was prity good.

will be gettin liners done in the next 2 weeks and then i can start putting everything together, will post pics etc of progress